About The Project

Okanagan Civil was selected as a subcontractor to Maple Reinders Construction on this project. The existing primary clarifier was nearing the end of its useful life and could not be taken out of service for maintenance, leaving the District with no system redundancy. Provincial and municipal wastewater regulations require two clarifiers for redundancy. This project adds a second primary clarifier along with a new pump gallery, splitter box, and blending box, strengthening long-term reliability and bringing Summerland’s wastewater system into full regulatory compliance to protect Okanagan Lake.

Project Highlights:

  • Excavation for the new clarifier, splitter box, pump gallery, and blending box
  • Concrete base, clarifier structure, splitter box, and pump gallery concrete pours
  • Splitter box tie-in to the existing treatment system
  • Install 450mm PI and PE piping, 150mm water, and associated civil piping and conduits
  • Asphalt paving and site restoration

Get In Touch

Have Questions? Connect With Our Civil Construction Experts

Find Us

For inquiries, feedback, or to discuss how we can assist with your upcoming projects, please feel free to get in touch with our team.

directions
17814 Bentley Rd,
Summerland, BC
V0H 1Z3