Okanagan Civil Projects

Dale Meadows Road & Watermain Improvements Phase 1

Project At A Glance

Location:

Summerland, BC

Client:

District of Summerland

 

Services & Scope:

  • Earth Works
  • Civil Works

About The Project

The Dale Meadows Phase 1 project, completed in 2023, focused on upgrading the water infrastructure and improving local amenities. The work involved replacing the existing 200mm AC watermain with 700 meters of 200mm PVC pipe and updating residential water services. The project also included road gravel and asphalt replacement, along with the installation of a Lock Block wall for slope stabilization. Additionally, park pathways were widened and extended, with a new fine gravel surface added to enhance accessibility and the overall park experience.

Project Highlights:

  • Replace existing 200mm AC watermain with 700m of 200mm PVC.
  • Replace residential water services and tie-in to new watermain.

  • Remove and replace road gravels c/w asphalt.

  • Install Lock Block wall for slope stabilization.
  • Widen and extend park pathways, install new pathway surface fine gravels.

Get In Touch

Have Questions? Connect With Our Civil Construction Experts

Find Us

For inquiries, feedback, or to discuss how we can assist with your upcoming projects, please feel free to get in touch with our team.

directions
17814 Bentley Rd,
Summerland, BC
V0H 1Z3