Okanagan Civil Projects

Dale Meadows & Watermain Improvements Phase 2

Project At A Glance

Location:

Summerland, BC

Client:

District of Summerland

 

Services & Scope:

  • Civil Works
  • Earth Works

About The Project

The Dale Meadows & Watermain Improvements Phase 2 project, completed in 2024, focused on upgrading the local water infrastructure to improve service and reliability. The project involved replacing the existing 200mm AC watermain with 600 meters of new 250mm PVC and HDPE pipe, along with updating residential water services and connecting them to the new system. Additional work included the removal and replacement of road structural gravels and asphalt, as well as utilizing horizontal directional drilling to cross under a creek .These improvements  helped enhance the overall water distribution system and infrastructure in the area.

Project Highlights:

  • Replace existing 200mm AC watermain with 600m of 250mm PVC and HDPE pipe.
  • Replace residential water services and tie-in to new watermain.

  • Remove and replace road structural gravels c/w asphalt.

  • Horizontal directional drilling under creek crossing.

Get In Touch

Have Questions? Connect With Our Civil Construction Experts

Find Us

For inquiries, feedback, or to discuss how we can assist with your upcoming projects, please feel free to get in touch with our team.

directions
17814 Bentley Rd,
Summerland, BC
V0H 1Z3