Winner Quarry Sediment Pond
Project At A Glance
Location:
Greenwood, BC
Client:
Rockwool
Services & Scope:
- Civil Works
- Earth Works
About The Project
The Winner Quarry Project, completed in 2024, involved the construction of a sediment pond to support water management needs. The project included 10,000m³ of excavation for the pond site, followed by the installation of a multi-layer pond liner system for durability and efficiency. Additional work involved placing and compacting sand over the liner and installing a large 1,800mm boxed concrete manhole with a sluice gate, ensuring proper water flow and control within the pond system.
Project Highlights:
- 10,000m3 of excavation to onsite stockpile for sediment pond.
-
Supply and install pond liner, which included 3 layers – Nonwoven Geotextile, LLDPE Geomembrane Liner and Double-Sided Geo-Composite.
-
Place and compact sand on top of liner.
- Supply and install 1,800mm boxed concrete manhole c/w sluice gate.