EFFICIENT. RELIABLE. EXCEPTIONAL.

Groundbreaking Achievements

Our projects exemplify the pinnacle of civil and earthworks excellence.

Okanagan Civil Constructors

A Portfolio Of Success

Browse through our featured projects to gain insights into our capabilities and see how we’ve contributed to the growth and development of communities and businesses across the Okanagan region. We look forward to the opportunity to add your project to our growing list of success stories.

December 2022 — July 2023
December 2022 — July 2023

Avery Industrial Park Earthworks - Reclamation of Old Weyerhaeuser Mill Site

Client: Avery Group


Location: Okanagan Falls


Scope of Work: Earthworks



  • 600,000m3 of material moved onsite. cut/fill, topsoil removal and replacement.

  • Build 1.2km of onsite roads.

  • Haul native material to crusher to produce 3” minus and 1” crush gravel.

July 2023 — September 2023
July 2023 — September 2023

Jubilee Road & Watermain Improvements

Client: District of Summerland


Location: Summerland


Scope of Work: Earthworks, Civil



  • Replace existing 200mm Cast Iron watermain with PVC.

  • Remove and replace road structure gravels c/w Asphalt.

  • Install concrete curbs, letdowns, and sidewalk.

  • Install Streetlight conduit c/w concrete bases.

Start June 2023
Start June 2023

Avery Industrial Park Civil Works - Reclamation of Old Weyerhaeuser Mill Site

Client: Avery Group


Location: Okanagan Falls


Scope of Work: Civil



  • Install 1.2km of 200mm sanitary main c/w services to each lot.

  • Install 1.5km of 300mm watermain c/w services to each lot.

  • Install 600mm HDPE culverts, Drywells

  • Streetlight bases c/w conduit.

August 2023 - November 2023
August 2023 - November 2023

Dale Meadows Road & Watermain Improvements

Client: District of Summerland


Location: Summerland


Scope of Work: Earthworks, Civil



  • Replace existing 200mm AC watermain with 700m of 200mm PVC

  • Replace residential water services and tie-in to new watermain.

  • Remove and replace road gravels c/w asphalt.

  • Install Lock Block wall for slope stabilization.

  • Widen and extend park pathways, install new pathway surface fine gravels.

Start September 2023
Start September 2023

Lower Similkameen Indian Band Elementary School

Client: Lower Similkameen Indian Band


Location: Cawston / Similkameen


Scope of Work: Earthworks, Building Preparation, Civil, Landscape



  • 20,000m3 of earthworks.

  • Sub excavate building area and replace with import gravel for footings.

  • Excavate, Sand, and backfill interior mechanical and electrical.

  • Install twin HDPE watermain (Domestic & Fire water).

  • Over 800m of landscape drainage perf pipe.

Start September 2023
Start September 2023

Sokana Multi-Family Development

Client: Kerkhoff Construction


Location: Penticton


Scope of Work: Site Excavation and Fill, building scope relating to structural, mechanical, and electrical, onsite and offsite civil,



  • 11,000m3 of earthworks (excavations and site fill).

  • Sub-excavate CMC piles, cut off piles, backfill with import gravel for Load Transfer Platform (LTP).

  • Excavate, Sand, and backfill interior structural footings, mechanical and electrical pipe.

  • Offsite civil works included 2 overbuild manholes for sewers and a watermain hot tap connection.

Start May 2024
Start May 2024

Dale Meadows & Watermain Improvements - Phase 2

Client: District of Summerland


Location: Summerland


Scope of Work: Earthworks, Civil



  • Replace existing 200mm AC watermain with 600m of 250mm PVC & HDPE pipe.

  • Replace residential water services and tie-in to new watermain.

  • Remove and replace road structural gravels c/w asphalt.

  • Horizontal directional drilling under creek crossing.

Start July 2024
Start July 2024

Lower Bench Development Site

Client: Revelstoke Mountain Resort


Location: Revelstoke


Scope of Work: Earthworks, Civil, Shallow utilities, Street lights



  • 19,000m3 of material moved onsite – cut/fills, topsoil removal and replacement.

  • Install 700m of 250-300mm sanitary main c/w services to each lot.

  • Install 475m of 250mm watermain c/w services to each lot.

  • Install 300-600mm HDPE culverts, drywells. 

  • Construct 500m of onsite road c/w road gravels and asphalt paving. 

  • Construct onsite and offsite MUP.

  • Streetlight bases c/w conduit. 

Get In Touch

Have Questions? Connect With Our Civil Construction Experts

Find Us

For inquiries, feedback, or to discuss how we can assist with your upcoming projects, please feel free to get in touch with our team.

directions
17814 Bentley Rd,
Summerland, BC
V0H 1Z3